Saturday, May 21, 2011

Jobs: NTPC ET Written Exam Result Engineering Executive Trainees

Jobs


NTPC ET Written Exam Result Engineering Executive Trainees
21 May 2011, 7:39 am


NTPC ET Written Test Result 2011

Engineering Executive Trainees (EETs)

NTPC has been operating its plants at high efficiency levels. Although the company has 18.79% of the total national capacity it contributes 28.60% of total power generation due to its focus on high efficiency. NTPC's share at 31 Mar 2001 of the total installed capacity of the country was 24.51% and it generated 29.68% of the power of the country in 2008-09. Every fourth home in India is lit by NTPC. As at 31 Mar 2011 NTPC's share of the country's total installed capacity is 17.75% and it generated 27.4% of the power generation of the country in 2010-11.



Tags: NTPC ET Written Test Result Engineering Executive Trainees result exam results examination result written exam result National Thermal Power Corporation limited NTPC ET result NTPC ET Written Test results NTPC ET Written exam result 2011 recruitment result details information website link url 

You are receiving this email because you subscribed to this feed at blogtrottr.com.

If you no longer wish to receive these emails, you can unsubscribe from this feed.

No comments:

Post a Comment

Job Archive